Vue de la page 0
I-Joist Storage and Handling
Safety
1. Walking on the joists should not be permitted until they are properly braced.
2. Lateral restraint, such as an existing deck or braced end wall,
must be established at the ends of the bay. Alternatively,
temporary or permanent sheathing may be nailed to the first
4 feet of the joists at the end of the bay.
3. All hangers, rim boards, rim joists and blocking at the supports
of the joists must be installed and nailed properly.
4. During installation, a minimum 1x4 temporary brace at least
8 feet long is required. Temporary bracing members should be
spaced at no further than 10*-0( o.c. and nailed to each joist
with two 8d nails (10d box nails if bracing thickness exceeds 1().
Lap bracing ends and anchor them to temporary or permanent
sheathing. Remove the temporary bracing as the permanent
sheathing is attached.
5. The ends of cantilevers must be temporarily braced on both
the top and bottom flanges.
6. Never overload sheathed joists with loads that exceed
design loads.
7. Do not ship or install any damaged I-joists.
8. When stacking construction material, stack only over
beams or walls, NOT on unsheathed joists.
Align stickers
one above
the other
Hard, dry,
level surface
10* max.
10*-0(
max.
1. CAUTION: Wrap and joists are slippery when icy or wet.
2. Store bundles upright on a smooth, level, well-drained and supportive
surface to protect from the weather (sun and precipitation). Keep covered
and strapped until installed.
3. Keep bundles above ground to minimize the absorption of ground moisture
and allow air circulation.
4. Re-cover unused products with bundle wrap. Repair damage to bundle
wrap with tape, more bundle wrap, plastic or weatherproof covering.
5. Place 2x or LVL spacers (at a maximum of 10* apart) under bundles
stacked on the ground, and between bundles stored on top of one another.
6. All handling of joists with a forklift or crane should be done carefully by
lifting from below the bottom of the bundle.
7. Joists should remain upright (web vertical) during handling.
8. Avoid excessive bowing during all phases of handling and installation
(i.e., measuring, sawing, or placement).
9. Damage may result if the I-joist is twisted or a load is applied to it
while it’s lying flat.
10. An MSDS is available at www.builditbetter.com.
11. When handling I-joists with a crane on the job site (“picking”), take a few
simple precautions to prevent damage to the I-joists and injury to your
work crew. Pick I-joists in bundles as shipped by the supplier. Orient the
bundles so that the webs of the I-joists are vertical. Pick the bundles at the
5th points, using a spreader bar if necessary.
installation Guide
GP LAM
®
LVL
®
WOOD I BEAM
JOISTS
®
FIBERSTRONG
®
RIM BOARD
®
WHAT YOU DONT
SEE MATTERS
United states Installation Instructions
for Residential Floor Systems
Vue de la page 0
1 2 3 4 5 6 7 8

Résumé du contenu

Page 1 - SEE MATTERS

I-Joist Storage and HandlingSafety1. Walking on the joists should not be permitted until they are properly braced.2. Lateral restraint, such as an

Page 2 - Allowable Floor Spans

Web StiffenersAllowable Floor SpansGP Joist Web Stiffener Requirementsweb sTIFFENEr sizesWeb stiffeners are not required to attain the spans shown in

Page 3 - I-Joist Installation

I-Joist Installation1. Except for cutting to length, top and bottom flanges of Wood I Beam™ I-joists shall not be cut, drilled or notched. 2. End

Page 4 - Floor Details

I-Joist InstallationUse single I-joist for loads up to 2000 plf, double I-joists for loads up to 4000 plf (filler block not required)Wall sheathing a

Page 5 - Web Holes

Web HolesNever drill, cut or notch the flange, or over-cut the web.Holes in webs should be cut with a sharp saw or drill bit, not by hammering (except

Page 6 - Installation Guide

28-0928-09 max.*L28-0928-09 max.*LCantilevers for Vertical Building Offsets (Concentrated Wall Load From Above)GP Lam® LVL Fastening Requirements

Page 7 - Cantilevers for Balconies

1. Snap a chalk line across the I-joists four feet in from the wall for panel edge alignment and as a boundary for spreading glue.2. Wipe any mud,

Page 8 - Bearing Details

LVL Allowable HolesDouble I-JoistsLVL Storage, Handling, and InstallationBearing DetailsBeam-to-Beam ConnectionBearing at WallBearing at Wood or Steel